Skip Navigation: Avoid going through Home page links and jump straight to content
NASA Logo - Jet Propulsion Laboratory    + View the NASA Portal
Search Stardust  
JPL Home Earth Solar System Stars & Galaxies Technology
Stardust Banner
Overview Mission Science Technology Newsroom Education Gallery Links Stardust Home
 
Weekly Status
Press Releases
Press Kits
Newsletters
Stardust in the News
Team Biographies
Media Contacts


STARDUST Status Report

December 3, 1999

There was only one scheduled Deep Space Network (DSN) pass in the last week, and all spacecraft subsystems are performing normally. Approximately five hours prior to the scheduled start of the DSN pass, a Payload Attitude Control Interface (PACI) reset occurred. The last time a PACI reset occurred was on July 30 and the spacecraft entered Safe Mode as a result. A Flight Software (FSW) patch was developed and installed in late August. This patch successfully re-enabled the PACI and prevented the spacecraft from entering Safe Mode as expected. Although the root cause of the resets has not been found, data is still being collected to help determine the cause.

The second part of flight sequence 12 was successfully retransmitted to the spacecraft and is now active and waiting for its start time on December 22. Sequence SC011 is the active sequence. Sequence SC012 is on-board and part one is waiting to start its execution on December 6.

For more information on the STARDUST mission - the first ever comet sample return mission - please visit the STARDUST home page:

http://stardust.jpl.nasa.gov



Last Updated: November 26, 2003
 
     
 
Privacy F.A.Q. Contact Sitemap Credit
 
FIRST GOV + Freedom of Information Act
+ The President's Management Agenda
+ FY 2002 Agency Performance and accountability report
+ NASA Privacy Statement, Disclaimer, and Accessiblity Certification
+ Freedom to Manage
NASA Home Page Site Manager:
Aimee Whalen

Webmaster:
Ron Baalke

http://www.jpl.nasa.gov http://www.nasa.gov http://www.caltech.edu/