National Aeronautics and Space Administration Logo
Follow this link to skip to the main content NASA Banner
Solar System Exploration
News & Events
SIRTF Status
SIRTF Status
25 Aug 2003
(Source: Jet Propulsion Laboratory)

MEDIA RELATIONS OFFICE
JET PROPULSION LABORATORY
CALIFORNIA INSTITUTE OF TECHNOLOGY
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
PASADENA, CALIFORNIA 91109. TELEPHONE (818) 354-5011
http://www.jpl.nasa.gov

Veronica McGregor (818) 354-9452
Jet Propulsion Laboratory, Pasadena, Calif.

News Release: 2003-118
August 25, 2003

Space Infrared Telescope Facility Mission Status

Following last night's picture-perfect launch, NASA's Space Infrared Telescope Facility is positioned exactly where ground controllers want it to be, trailing behind Earth as it orbits the Sun. The spacecraft is working and communicating well with the Deep Space Network antennas, receiving commands and returning telemetry data.

The spacecraft entered a stand-by mode when its star tracker did not lock on to its planned targets within the expected 60 seconds. This possibility was anticipated, and therefore engineers had already prepared a contingency plan, which has been activated. The star tracker did subsequently lock onto its targets and engineers believe the delay is likely due to higher-than-expected background noise levels.

The operations team is also investigating two thrusters that are somewhat warmer than expected, and some inconsistent telemetry points from the cryogenic telescope assembly.

"These types of anomalies are expected in a space observatory of this size and complexity," said David Gallagher, Space Infrared Telescope Facility project manager at NASA's Jet Propulsion Laboratory, Pasadena, Calif. "The team is ecstatic with the successful launch and the way the mission is progressing overall. We eagerly await the start of science observations."

The next milestone will occur when the telescope's dust cover is opened in five days. This event occurs during the mission's two-month in-orbit checkout, which will be followed by a one-month science verification phase. After that, the science mission will begin a quest to unlock some of the oldest cosmic mysteries, and to look for possible planetary construction zones in discs around other stars. JPL, a division of the California Institute of Technology in Pasadena, manages the Space Infrared Telescope Facility for NASA's Office of Space Science, Washington, D.C. Further information about the Space Infrared Telescope Facility is available at http://sirtf.caltech.edu/

News Archive Search  Go!
Show  results per page
 
 
Awards and Recognition   Solar System Exploration Roadmap   Contact Us   Site Map   Print This Page
NASA Official: Kristen Erickson
Advisory: Dr. James Green, Director of Planetary Science
Outreach Manager: Alice Wessen
Curator/Editor: Phil Davis
Science Writer: Autumn Burdick
Producer: Greg Baerg
Webmaster: David Martin
> NASA Science Mission Directorate
> Budgets, Strategic Plans and Accountability Reports
> Equal Employment Opportunity Data
   Posted Pursuant to the No Fear Act
> Information-Dissemination Policies and Inventories
> Freedom of Information Act
> Privacy Policy & Important Notices
> Inspector General Hotline
> Office of the Inspector General
> NASA Communications Policy
> USA.gov
> ExpectMore.gov
> NASA Advisory Council
> Open Government at NASA
Last Updated: 27 Aug 2003