National Aeronautics and Space Administration Logo
Follow this link to skip to the main content NASA Banner
Solar System Exploration
News & Events
New Asteroid Target Chosen for Japanese-U.S. Mission
New Asteroid Target Chosen for Japanese-U.S. Mission
7 Aug 2000
(Source: Jet Propulsion Laboratory)

MEDIA RELATIONS OFFICE
JET PROPULSION LABORATORY
CALIFORNIA INSTITUTE OF TECHNOLOGY
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
PASADENA, CALIF. 91109. TELEPHONE (818) 354-5011
http://www.jpl.nasa.gov

Contact: Martha J. Heil (818) 354-0850

The MUSES-C project, a joint effort of Japan's Institute of Space and Astronautical Sciences (ISAS) and NASA to explore an asteroid and return a sample to Earth, has announced that the asteroid target of the project and the launch date have been changed.

The launch is now slated for November or December 2002, arrival at the asteroid in September 2005 and return to earth in June of 2007. Its previous schedule included launch in July 2002, arrival at its previous target in 2003, and return to Earth in June 2006.

The new target is the asteroid 1998 SF36. The NASA-built science payload is a rover that will gather and transmit science data to the Japanese spacecraft. The spacecraft will then gather and return to Earth samples of the asteroid. The ISAS-built spacecraft will stay at the asteroid for three months.

The launch date and subsequent target asteroid changes are due to delays in the provision of the Japanese MV launch vehicle, which will carry the MUSES mission to space.

Asteroid 1998 SF36, whose orbital period is about 1.5 years, will approach to within 6.4 million kilometers (4 million miles) of the Earth on March 29, 2001 and to within about 2.09 million kilometers (1.3 million miles) on June 25, 2004. Extensive ground-based observing campaigns will be planned near these close approach times to determine the asteroid's approximate size, shape, rotation state, and some surface characteristics.

NASA's Jet Propulsion Laboratory in Pasadena, Calif., is managing the U.S. portion of the mission, which is called MUSES- CN, and includes the rover and various support services for the ISAS mission. ("MUSES-C" stands for Mu Space Engineering Spacecraft C, "N" refers to NASA.) The JPL MUSES-CN project has also arranged for the testing of the MUSES-C reentry heat shield at NASA's Ames Research Center, Moffett Field, Calif. JPL will also arrange for supplemental tracking of the spacecraft by NASA's Deep Space Network, and will assist in navigating the spacecraft to the asteroid. Japanese and U.S. scientists will collaborate on the investigations of the asteroid and the returned samples.

For more information, see http://www.jpl.nasa.gov/facts/muses.pdf.

MUSES CN is managed for NASA's Office of Space Science by the Jet Propulsion Laboratory, Pasadena, Calif. JPL is a division of the California Institute of Technology in Pasadena.

News Archive Search  Go!
Show  results per page
 
 
Awards and Recognition   Solar System Exploration Roadmap   Contact Us   Site Map   Print This Page
NASA Official: Kristen Erickson
Advisory: Dr. James Green, Director of Planetary Science
Outreach Manager: Alice Wessen
Curator/Editor: Phil Davis
Science Writer: Autumn Burdick
Producer: Greg Baerg
Webmaster: David Martin
> NASA Science Mission Directorate
> Budgets, Strategic Plans and Accountability Reports
> Equal Employment Opportunity Data
   Posted Pursuant to the No Fear Act
> Information-Dissemination Policies and Inventories
> Freedom of Information Act
> Privacy Policy & Important Notices
> Inspector General Hotline
> Office of the Inspector General
> NASA Communications Policy
> USA.gov
> ExpectMore.gov
> NASA Advisory Council
> Open Government at NASA
Last Updated: 5 Jun 2001