National Aeronautics and Space Administration Logo
Follow this link to skip to the main content NASA Banner
Solar System Exploration
News & Events
NASA's GRAIL Moon Twins are Joined to Their Booster
NASA's GRAIL Moon Twins are Joined to Their Booster
18 Aug 2011
(Source: NASA/JPL)

GRAIL
NASA's twin Gravity Recovery and Interior Laboratory (GRAIL) spacecraft are lowered onto the second stage of their Delta II launch. Image credit: NASA/KSC

CAPE CANAVERAL, Fla. -- NASA's lunar-bound GRAIL twins were mated to their Delta II launch vehicle at the Cape Canaveral Air Force Station's Launch Complex 17 at 8:45 a.m. EDT (5:45 a.m. PDT) today. The 15-mile (25-kilometer) trip from Astrotech Space Operations in Titusville, Fla., is the last move for GRAIL before it begins its journey to the moon. NASA's dynamic duo will orbit the moon to determine the structure of the lunar interior from crust to core and to advance understanding of the thermal evolution of the moon.

"We are about to finish one chapter in the GRAIL story and open another," said Maria Zuber, GRAIL's principal investigator, based at the Massachusetts Institute of Technology in Cambridge. "Let me assure you this one is a real page-turner. GRAIL will rewrite the book on the formation of the moon and the beginning of us."

Now that the GRAIL spacecraft are atop their rocket, a final flurry of checks and tests can begin to confirm that all is go for launch. The final series of checks begins tomorrow, Aug. 19, with an on-pad functional test. The test is designed to confirm that the spacecraft is healthy after the fueling and transport operations. Next week, among all the upcoming final tests, reviews and closeout operations leading up to liftoff, the GRAIL team will install the launch vehicle fairing around the spacecraft.

GRAIL's launch period opens Sept. 8 and extends through Oct. 19. On each day, there are two separate instantaneous launch opportunities separated in time by approximately 39 minutes. On Sept. 8, the first launch opportunity is at 8:37 a.m. EDT (5:37 a.m. PDT). The second launch opportunity is 9:16 a.m. EDT (6:16 a.m. PDT).

NASA's Jet Propulsion Laboratory, Pasadena, Calif., manages the GRAIL mission. The Massachusetts Institute of Technology, Cambridge, is home to the mission's principal investigator, Maria Zuber. The GRAIL mission is part of the Discovery Program managed at NASA's Marshall Space Flight Center in Huntsville, Ala. Lockheed Martin Space Systems, Denver, built the spacecraft. Launch management for the mission is the responsibility of NASA's Launch Services Program at the Kennedy Space Center in Florida. JPL is a division of the California Institute of Technology in Pasadena.

More information about GRAIL is online at: http://www.nasa.gov/grail and http://grail.nasa.gov.


DC Agle
Jet Propulsion Laboratory, Pasadena, Calif.
818-393-9011
agle@jpl.nasa.gov

Dwayne Brown 202-358-1726
Headquarters, Washington
Dwayne.c.brown@nasa.gov

News Archive Search  Go!
Show  results per page
 
 
Awards and Recognition   Solar System Exploration Roadmap   Contact Us   Site Map   Print This Page
NASA Official: Kristen Erickson
Advisory: Dr. James Green, Director of Planetary Science
Outreach Manager: Alice Wessen
Curator/Editor: Phil Davis
Science Writer: Autumn Burdick
Producer: Greg Baerg
Webmaster: David Martin
> NASA Science Mission Directorate
> Budgets, Strategic Plans and Accountability Reports
> Equal Employment Opportunity Data
   Posted Pursuant to the No Fear Act
> Information-Dissemination Policies and Inventories
> Freedom of Information Act
> Privacy Policy & Important Notices
> Inspector General Hotline
> Office of the Inspector General
> NASA Communications Policy
> USA.gov
> ExpectMore.gov
> NASA Advisory Council
> Open Government at NASA
Last Updated: 22 Aug 2011