Aquarius and Juno
Aquarius and Juno are scheduled to launch this year.

Spacecraft: Aquarius
Launch Vehicle: Delta II 7320
Launch Site: Vandenberg Air Force Base, Calif.
Launch Pad: Space Launch Complex 2
Launch Date: June 9, 2011
Launch Window: 7:20:13 - 7:25:13 a.m. PDT
Altitude/Inclination: 408 miles/98 degrees

At Vandenberg Air Force Base, the Aquarius/SAC-D spacecraft is undergoing Limited Performance Tests including the SAC-D service platform, the Aquarius science instrument, and the SAC-D instruments.

At NASA's Space Launch Complex 2, the Delta II second-stage propulsion system qualification testing is under way. First-stage propulsion system qualification testing is scheduled for next week.

The Aquarius/SAC-D mission is a collaboration between NASA and Argentina's space agency with participation by Brazil, Canada, France and Italy. NASA's Launch Services Program at the Kennedy Space Center in Florida is managing the launch. United Launch Alliance of Denver, Colo., is NASA's launch service provider of the Delta II 7320.

Spacecraft: Juno
Launch Vehicle: Atlas V 551
Launch Site: Cape Canaveral Air Force Station, Fla.
Launch Pad: Complex 41
Launch Date: Aug. 5, 2011
Launch Time: 11:40 a.m. EDT

The Juno spacecraft arrived at Kennedy Space Center's Shuttle Landing Facility aboard an Air Force C-17 cargo plane at 7:55 p.m. on April 8.

The spacecraft had been shipped from Lockheed Martin Space Systems in Denver. It was offloaded from the aircraft and taken to the Astrotech payload processing facility located near Kennedy Space Center. On April 9, it was moved inside the processing high bay, the lid to the shipping container was lifted from over the spacecraft, and the protective wrap surrounding it was removed.

On April 11, Juno was lifted onto a rotation and test fixture and rotated from the vertical to horizontal configuration so that electrical testing could begin. Initial testing now is under way. Antenna installations, including the high gain antenna, begin April 20.

The solar-powered Juno spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere.


George H. Diller
Kennedy Space Center, Fla.
321-867-2468
george.h.diller@nasa.gov

STATUS REPORT : ELV-041411


Previous status reports are available at: http://www.nasa.gov/centers/kennedy/launchingrockets/status/index.html

News Archive Search  Go!
Show  results per page
 
 
Awards and Recognition   Solar System Exploration Roadmap   Contact Us   Site Map   Print This Page
NASA Official: Kristen Erickson
Advisory: Dr. James Green, Director of Planetary Science
Outreach Manager: Alice Wessen
Curator/Editor: Phil Davis
Science Writer: Autumn Burdick
Producer: Greg Baerg
Webmaster: David Martin
> NASA Science Mission Directorate
> Budgets, Strategic Plans and Accountability Reports
> Equal Employment Opportunity Data
   Posted Pursuant to the No Fear Act
> Information-Dissemination Policies and Inventories
> Freedom of Information Act
> Privacy Policy & Important Notices
> Inspector General Hotline
> Office of the Inspector General
> NASA Communications Policy
> USA.gov
> ExpectMore.gov
> NASA Advisory Council
> Open Government at NASA
Last Updated: 15 Apr 2011