Mars Global Surveyor Status Report
Wednesday, September 18, 2002 (DOY 254/19:00:00 to DOY 261/19:00:00 UTC)

Launch / Days since Launch = Nov. 7, 1996 / 2142 days
Start of Mapping / Days since Start of Mapping = April 1, 1999 / 1267 days
Total Mapping Orbits = 15,779
Total Orbits = 17,462

Recent Events:

Background Sequences - The spacecraft is operating nominally in performing the beta-supplement daily recording and transmission of science data. The mm209 sequence executed successfully from 02-255 (9/12/02) through 02-257 (9/14/02). The mm210 sequence has performed well since it started on 02-258 (9/15/02). It terminates on 02-261 (9/18/02). The mm211 sequence, successfully uplinked on 02-260 (9/17/02), begins executing near the end of day on 02-261 (9/18/02).

Other - The three Roll Only Targeted Observations (ROTOs) reported as successful last week were in fact not successful. The images taken during those ROTOs and the first two ROTOs in mz200 were distorted because the spacecraft was slewing slowly while the images were being taken. The relative slew rate parameter had been set to orbital rate while the equator-crossing software patch was being loaded on 02-248 (9/05/02). The parameter was not reset to zero following the patch update. The problem was discovered on 02-255 (9/12/02) and corrected on 02-256 (9/13/02). The following four ROTOs in mz200 and six ROTOs in mz201 were performed successfully. MGS has successfully completed 306 ROTOs to date.

Spacecraft Health:

Spacecraft subsystems report good health and status.

Uplinks:

There have been 23 uplinks to the spacecraft during the past week, including new star catalog and ephemeris files; instrument command loads; the mi0654 slew-rate parameter update; the mz200, mz201 & mz202 ROTO mini-sequences; and the mm210 & mm211 background sequences. 7,040 command files have been radiated to the spacecraft since launch.

Upcoming Events:

ROTOs are planned for next week in the mz201, mz202, & mz203 mini-sequences. Radio Science Occultation Egress Scans will be performed on 02-273 (9/30/02) and 02-274 (10/01/02). A DDOR experiment is scheduled for 02-276 (10/03/03).

News Archive Search  Go!
Show  results per page
 
 
Awards and Recognition   Solar System Exploration Roadmap   Contact Us   Site Map   Print This Page
NASA Official: Kristen Erickson
Advisory: Dr. James Green, Director of Planetary Science
Outreach Manager: Alice Wessen
Curator/Editor: Phil Davis
Science Writer: Autumn Burdick
Producer: Greg Baerg
Webmaster: David Martin
> NASA Science Mission Directorate
> Budgets, Strategic Plans and Accountability Reports
> Equal Employment Opportunity Data
   Posted Pursuant to the No Fear Act
> Information-Dissemination Policies and Inventories
> Freedom of Information Act
> Privacy Policy & Important Notices
> Inspector General Hotline
> Office of the Inspector General
> NASA Communications Policy
> USA.gov
> ExpectMore.gov
> NASA Advisory Council
> Open Government at NASA
Last Updated: 24 Sep 2002