National Aeronautics and Space Administration Logo
Follow this link to skip to the main content NASA Banner
Solar System Exploration
News & Events
NASA's 2001 Mars Odyssey Spacecraft Poised to Arrive at Mars
NASA's 2001 Mars Odyssey Spacecraft Poised to Arrive at Mars
18 Oct 2001
(Source: Jet Propulsion Laboratory)

MEDIA RELATIONS OFFICE
JET PROPULSION LABORATORY
CALIFORNIA INSTITUTE OF TECHNOLOGY
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
PASADENA, CALIFORNIA 91109. TELEPHONE (818) 354-5011
http://www.jpl.nasa.gov

Contacts:
JPL/Mary Hardin (818) 354-0344
NASA Headquarters/Donald Savage (202) 358-1547

After 200 days of travel and more than 460 million kilometers (about 285 million miles) logged on its odometer, NASA's 2001 Mars Odyssey spacecraft will fire its main engine for the first and only time Oct. 23 and put itself into orbit around the red planet.

Odyssey was launched April 7 from Cape Canaveral Air Force Station, Fla. Other than our Moon, Mars has attracted more spacecraft exploration attempts than any other object in the solar system, and no other planet has proved as daunting to success. Of the 30 missions sent to Mars by three countries over 40 years, less than one-third have been successful.

"The spacecraft, ground system and flight team are ready for Mars orbit insertion," said Matthew Landano, Odyssey project manager at NASA's Jet Propulsion Laboratory, Pasadena, Calif. "We uplinked the sequence of commands that control the orbit insertion on Oct. 15. Now we will closely monitor the spacecraft's progress as it approaches Mars and executes the orbit insertion burn."

To enter orbit, Odyssey's propellant tanks, the size of big beachballs, must first be pressurized, plumbing lines heated, and the system primed before 262.8 kilograms (579.4 pounds) of propellant is burned in exactly the right direction for 19.7 minutes.

Flight controllers at JPL will see the main engine burn begin a few seconds after 7:26 p.m. Pacific time on the evening of Oct. 23. (Events in space are usually measured in Universal Time - formerly called Greenwich Mean Time - under which the Mars arrival occurs on Oct. 24. In the United States, however, the arrival will take place the evening of Oct. 23.)

The spacecraft will pass behind the planet 10 minutes later and will be out of contact for about 20 minutes. The burn is expected to end at 7:46 p.m. Pacific time, but controllers will not receive confirmation until a few minutes later when the spacecraft comes out from behind Mars and reestablishes contact with Earth at about 8 p.m.

The firing of the main engine will brake the spacecraft's speed, slowing and curving its trajectory into an egg-shaped elliptical orbit around the planet. In the weeks and months ahead, the spacecraft will repeatedly brush against the top of the atmosphere in a process called aerobraking to reduce the long, 19-hour elliptical orbit into a shorter, 2-hour circular orbit of approximately 400 kilometers (about 250 miles) altitude desired for the mission's science data collection.

NASA's latest explorer carries several scientific instruments to map the chemical and mineralogical makeup of Mars: a gamma ray spectrometer that includes a neutron spectrometer and a high-energy neutron detector; a thermal-emission imaging system; and a Martian radiation environment experiment.

The 2001 Mars Odyssey Arrival press kit is available online at
http://www.jpl.nasa.gov/news/press_kits/odysseyarrival.pdf.

JPL manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. Principal investigators at Arizona State University in Tempe, the University of Arizona in Tucson, and NASA's Johnson Space Center, Houston, Texas, operate the science instruments. Lockheed Martin Astronautics, Denver, Colo., is the prime contractor for the project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena. NASA's Langley Research Center in Hampton, Va., will provide aerobraking support to JPL's navigation team during mission operations.

News Archive Search  Go!
Show  results per page
 
 
Awards and Recognition   Solar System Exploration Roadmap   Contact Us   Site Map   Print This Page
NASA Official: Kristen Erickson
Advisory: Dr. James Green, Director of Planetary Science
Outreach Manager: Alice Wessen
Curator/Editor: Phil Davis
Science Writer: Autumn Burdick
Producer: Greg Baerg
Webmaster: David Martin
> NASA Science Mission Directorate
> Budgets, Strategic Plans and Accountability Reports
> Equal Employment Opportunity Data
   Posted Pursuant to the No Fear Act
> Information-Dissemination Policies and Inventories
> Freedom of Information Act
> Privacy Policy & Important Notices
> Inspector General Hotline
> Office of the Inspector General
> NASA Communications Policy
> USA.gov
> ExpectMore.gov
> NASA Advisory Council
> Open Government at NASA
Last Updated: 18 Oct 2001