National Aeronautics and Space Administration Logo
Follow this link to skip to the main content NASA Banner
Solar System Exploration
News & Events
Mars Odyssey Mission Status
Mars Odyssey Mission Status
17 Sep 2001
(Source: Jet Propulsion Laboratory)

MEDIA RELATIONS OFFICE
JET PROPULSION LABORATORY
CALIFORNIA INSTITUTE OF TECHNOLOGY
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
PASADENA, CALIFORNIA 91109. TELEPHONE (818) 354-5011
http://www.jpl.nasa.gov

NASA's 2001 Mars Odyssey spacecraft performed its third trajectory correction maneuver last night to fine-tune its flight path for arrival at Mars next month.

At 4:06 a.m. Universal time on Monday, Sept. 17 (9:06 p.m. Pacific time, Sunday, Sept. 16), Odyssey fired its small thrusters for 12 seconds, which changed the speed and direction of the spacecraft by .45 meters per second (1 mile per hour). Odyssey will arrive at Mars at 0230 Universal time Oct. 24 (7:30 p.m. Pacific time Oct. 23).

"This was the first maneuver to target our final aim point for Mars orbit insertion. Early indications are that the maneuver was right on the money," said David A. Spencer, Odyssey's mission manager at NASA's Jet Propulsion Laboratory, Pasadena, Calif.

During the past several weeks, the flight team has been troubleshooting occasional problems with its star camera. Flight controllers use the star camera to determine Odyssey's orientation in space. During most of cruise, the star camera has been shaded from the sun by the high gain antenna. When the spacecraft has been rotated so that the star camera is no longer shaded, the images from the star camera have been saturated by sunlight. An internal shade within the star camera is supposed to prevent image saturation. Engineers determined that part of the problem was reflected light from the open door of the gamma ray spectrometer instrument. The door was closed on August 31. A subsequent checkout of the planned spacecraft orientations for the rest of the mission showed that the star camera should provide valid images during these critical periods.

Also on August 31, the flight team transitioned the spacecraft to a new orientation for the remainder of its cruise. The new orientation is designed to limit the number of times Odyssey needs to fire its small thrusters to de-spin the reaction wheels as they build up momentum.

On September 6, the flight team performed a checkout of the spacecraft telecommunications subsystem for Mars orbit insertion. During the checkout, the spacecraft was turned to the planned orientation for the large burn, and the radio signal from the spacecraft was monitored. All systems performed as expected.

Today, Odyssey is 10.8 million kilometers (6.7 million miles) from Mars, traveling at a speed of 24 kilometers per second (52,700 miles per hour) relative to the Sun.

The 2001 Mars Odyssey mission is managed by JPL for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology in Pasadena. The Odyssey spacecraft was built by Lockheed Martin Astronautics, Denver. The thermal emission imaging system is managed by Arizona State University, Tempe, and the gamma ray spectrometer is managed by the University of Arizona, Tucson. NASA's Johnson Space Center, Houston, built and manages the Martian radiation environment experiment. The thermal emission imaging system is managed by Arizona State University, Tempe, and the gamma ray spectrometer is managed by the University of Arizona, Tucson.

News Archive Search  Go!
Show  results per page
 
 
Awards and Recognition   Solar System Exploration Roadmap   Contact Us   Site Map   Print This Page
NASA Official: Kristen Erickson
Advisory: Dr. James Green, Director of Planetary Science
Outreach Manager: Alice Wessen
Curator/Editor: Phil Davis
Science Writer: Autumn Burdick
Producer: Greg Baerg
Webmaster: David Martin
> NASA Science Mission Directorate
> Budgets, Strategic Plans and Accountability Reports
> Equal Employment Opportunity Data
   Posted Pursuant to the No Fear Act
> Information-Dissemination Policies and Inventories
> Freedom of Information Act
> Privacy Policy & Important Notices
> Inspector General Hotline
> Office of the Inspector General
> NASA Communications Policy
> USA.gov
> ExpectMore.gov
> NASA Advisory Council
> Open Government at NASA
Last Updated: 17 Sep 2001